YPRT

  • Ozyegin University-Education Building

The interior of the building block on the E-5, dated 1996, was completely changed and arranged for the use of the university.

In the building, which will be used as the first and temporary campus of the university, it was aimed to place the functions on the blocks and floors in the most accurate way. Education started in 2008 in the building, whose architectural, interior design and application supervision was done by Plan A.

The project area is 12.000m2. Yapiarti’s scope is turnkey fit out including electrical and mechanical works of campus building. The project is designed by Plan A Architecture.The client is Fiba Holding- Ozyegin University

OLYMPUS DIGITAL CAMERA
OLYMPUS DIGITAL CAMERA
özyegin5